    Analytical Framework for Understanding the Differences between Technical Standards Originating from Various Regions to Improve International Hydropower Project Delivery
    You, R ; Tang, W ; Duffield, CF ; Zhang, L ; Hui, F ; Kang, Y (MDPI, 2022-02)
    The international hydropower construction market is continuously growing during the past decade. The existing literature points out that contractors are facing ongoing difficulties in achieving the objectives of developing international hydropower projects, which largely arise from the misunderstanding and poor use of international technical standards. However, there is a lack of a coherent framework to help systematically analyze the differences between technical standards originating from various regions. This study establishes an analytical framework that incorporates the essential factors of technical standards, namely philosophy of standards, logical structure, completeness of standards, calculation method, equipment and material requirements, test method, construction method, and application conditions of standards, and demonstrates their relationships from a holistic perspective. With support of the data collected from Chinese contractors, the results revealed the application status of various technical standards and their differences. Hierarchical cluster analysis demonstrates that unfamiliarity with the differences between domestic and international technical standards can cause multiple problems in international hydropower project delivery, concerning applying international standards, integrated project management, design, procurement, and construction, which have broad theoretical and practical implications. The outcomes of this study can not only help contractors improve their capabilities of applying international standards for achieving superior international hydropower project performance, but also facilitate mutual recognition of the standards from various regions, thereby maximizing the effectiveness of global resources such as expertise, technologies, methods, and products.
  • Item
    No Preview Available
    Upcycling opportunities and potential markets for aluminium composite panels with polyethylene core (ACP-PE) cladding materials in Australia: A review
    Pilipenets, O ; Gunawardena, T ; Hui, FKP ; Nguyen, K ; Mendis, P ; Aye, L (ELSEVIER SCI LTD, 2022-11-28)
    Many buildings worldwide have high fire-risk materials as part of their cladding. As governments in Australia strive to make buildings safer, it is expected that a large volume of end-of-life dangerous cladding will be replaced with safer materials. This high volume of hazardous materials might be upcycled into value-added products. This article presents a systematic market analysis and literature review in identifying current and potential uses for the raw materials used in hazardous ACP-PE cladding. The most promising areas were identified to be non-food-contact packaging (US$228 M p.a.), non-pressure pipes (US$30 M p.a.), footwear (US$5.29 M p.a.) and 3D printer filament (US$2.73 M p.a.)
  • Item
    Thumbnail Image
    Framework for standardising carbon neutrality in building projects
    Too, J ; Ejohwomu, OA ; Hui, FKP ; Duffield, C ; Bukoye, OT ; Edwards, DJ (Elsevier, 2022-11-01)
    The construction industry accounts for approximately 40% of the global carbon emissions and is the largest consumer of materials and energy. Given the Paris Agreement target towards global net-zero greenhouse gas (GHG) emissions, significant changes are required in the design, construction and use of buildings. This study applies a qualitative approach that combines a systematic literature review (SLR) with in-depth semi-structured interviews with experts to analyse existing carbon neutrality frameworks and decision support tools; expanding current knowledge by bringing to the fore the challenges experienced in implementing these frameworks. This research effort reveals an inadequacy in frameworks for effective decision-making on decarbonisation strategies along the project lifecycle. A novel framework that breaks down the activities and decision points across the entire project lifecycle is proposed to bridge this gap in literature. The developed framework defines whole lifecycle cost, whole lifecycle energy use, exergetic lifecycle and whole lifecycle emissions as the four critical underpinning variables considered in making decarbonisation decisions. It further details the key evaluation criteria to facilitate decision-making at each stage of the project lifecycle and provides decision-makers with contextual guidance for assessing the impact of their decarbonisation decisions at the planning, delivery, closure and operations phases of the project. It will assist academic researchers, building owners and industry professionals to keep track of the project's carbon neutrality target and encourage best practices for carbon emission reduction in the building sector.
  • Item
    No Preview Available
    A review of facilities management interventions to mitigate respiratory infections in existing buildings
    Zhang, Y ; Hui, FKP ; Duffield, C ; Saeed, AM (PERGAMON-ELSEVIER SCIENCE LTD, 2022-08-01)
    The Covid-19 pandemic reveals that the hazard of the respiratory virus was a secondary consideration in the design, development, construction, and management of public and commercial buildings. Retrofitting such buildings poses a significant challenge for building owners and facilities managers. This article reviews current research and practices in building operations interventions for indoor respiratory infection control from the perspective of facilities managers to assess the effectiveness of available solutions. This review systematically selects and synthesises eighty-six articles identified through the PRISMA process plus supplementary articles identified as part of the review process, that deal with facilities' operations and maintenance (O&M) interventions. The paper reviewed the context, interventions, mechanisms, and outcomes discussed in these articles, concluding that interventions for respiratory virus transmission in existing buildings fall into three categories under the Facilities Management (FM) discipline: Hard services (HVAC and drainage system controls) to prevent aerosol transmissions, Soft Services (cleaning and disinfection) to prevent fomite transmissions, and space management (space planning and occupancy controls) to eliminate droplet transmissions. Additionally, the research emphasised the need for FM intervention studies that examine occupant behaviours with integrated intervention results and guide FM intervention decision-making. This review expands the knowledge of FM for infection control and highlights future research opportunities.
  • Item
    No Preview Available
    Effects of learning curve models on onshore wind and solar PV cost developments in the USA
    Castrejon-Campos, O ; Aye, L ; Hui, FKP (PERGAMON-ELSEVIER SCIENCE LTD, 2022-05)
    Technological innovation planning for developing and deploying clean energy technologies plays a key role in reducing greenhouse gas emissions and transition to a low-carbon future. Learning curve theory has been adopted as a common framework for exploring the relationship between endogenous technological learning and technology cost developments. The aim of this article is to analyse the effects of selecting different learning curve approaches (i.e. model formulations) to describe energy technology cost changes over time. Experience and knowledge stock are chosen as the sources of learning to be considered. A new definition of experience was developed to account for the interaction between global and local experience. The new definition of experience also accounts for learning sub-processes (i.e. learning-by-doing, learning-by-using, and experience spillovers) to estimate total experience gained through technology deployment. An integrative model is developed for estimating the effects of learning-by-deploying and learning-by-researching on cost developments for onshore wind and solar PV in the USA. Publicly available data from government departments and organisations were utilised. It was found that technology cost developments are better explained when: (1) experience is defined as a function of global and local experience; (2) knowledge stock is also considered in the model formulation; and (3) technological processes affect only a fraction of the total capital cost. The findings suggested that the application of learning rates for model-based energy planning is context-dependent and how technological factors are explicitly defined may have significantly different policy implications (i.e. different technology costs predictions based on alternative model formulations).
  • Item
    Thumbnail Image
    HOW TO GET INTERNATIONAL CONSTRUCTION PROJECTS DELIVERED ON TIME: FROM CHINESE CONTRACTORS' PERSPECTIVE
    Sun, H ; Tang, W ; Duffield, CF ; Zhang, L ; Hui, FKP (VILNIUS GEDIMINAS TECH UNIV, 2022)
    67.9% of Chinese international construction projects are seriously delayed, which creates the potential for instability in its rapidly growing share of global contracting markets. A greater understanding of the reasons behind the challenges confronting international contractors is urgently required such that improvements can be developed that ultimately will benefit many countries. This study aims to investigate the time performance of international projects in developing countries and to explore the root causes of time overrun. Based on both quantitative and qualitative analysis of 112 case study projects, collected from 12 of the largest Chinse state-owned enterprises (SOEs), this study identifies the distinctive characteristics of three types of projects (late, acceptable, early) classified based on their time performances. It is established that time performance is significantly related to the contractor’s adaptability and project complexity. The results reveal the root causes of construction delays in international project delivery, which provides a structured and in-depth understanding of both internal and external time performance influential factors. The above findings provide sound basis for guiding practitioners in choosing appropriate strategies to improve project time performance, such as encouraging cross-cultural dialogues, integrating global resources and establishing long-term global partnerships with stakeholders.